Section 278 agreement - works to existing highways
Section 278 of the Highways Act 1980 allows a developer to carry out works to the public highway. This is generally necessary where planning permission has been granted for a development that requires improvements to, or changes to, public highways.
The agreement between the highway authority and the developer is called a Section 278 Agreement, and it may allow for items such as:
- Roundabouts.
- Priority junctions.
- Junctions with traffic lights.
- Right turn lanes.
- Improved facilities for pedestrians and cyclists.
- Improvements to existing junctions.
- Traffic calming measures.
The highway authority will be either Highways England for the strategic road network in England, or the local highway authority.
The agreement may include:
- Details of the relevant planning permission.
- The agreed design.
- Details of any bond required.
- Details of who will design and manage the works.
- The programme for the works.
- Provision for inspection and certification of the works.
- Costs.
The developer may be responsible for designing, carrying out and paying for the works to the satisfaction of the local highway authority, or the highway authority may carry out the works. The developer may also pay for all or part of works carried out by the highway authority if they are carried out in a way, at a time, or are modified to suit the developer.
In addition to the works themselves, the developer may be required to pay costs associated with:
- Making the agreement.
- Agreeing the scheme for the works.
- Permissions associated with the works.
- Land acquisition associated with the works.
- Administrative expenses incurred by the highway authority.
- Maintenance of the works (commuted sums).
If the developer is carrying out the works, there may be a requirement for a bond to cover the highway authority against the possibility that the developer fails to properly complete the works, for example if they become insolvent. The bond will be released incrementally until a twelve month maintenance period has elapsed after the works are complete.
The planning application associated with the development will generally establish the principles of the works required. The highway authority cannot then refuse to enter into an agreement for the developer to undertake the approved works as long as the works meet the appropriate standards.
If the developer fails to make agreed payments, or if the works are not carried out in accordance with the agreement, the highway authority is empowered to close the access to the site.
The procedure necessary to reach agreement can be time consuming and protracted, and so it is desirable to enter into discussion with the highway authority as early in the project as possible.
Section 278 Agreements are often entered into alongside Section 38 Agreements, which enable developers to ask the highway authority to ‘adopt’ new roads along with associated infrastructure such as drains, lighting and supporting structures. See Section 38 Agreement for more information.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
- Highways.
- Manual of Contract Documents for Highway Works.
- Planning condition.
- Planning obligation (Section 106 Agreement).
- Planning permission.
- Reserved matters.
- Section 38 Agreement.
- Section 50 agreement.
- Section 184 agreement.
- Section 215.
[edit] External references.
Featured articles and news
International Electrician Day, 10 June 2025
Celebrating the role of electrical engineers from André-Marie Amperè, today and for the future.
New guide for clients launched at Houses of Parliament
'There has never been a more important time for clients to step up and ...ask the right questions'
The impact of recycled slate tiles
Innovation across the decades.
EPC changes for existing buildings
Changes and their context as the new RdSAP methodology comes into use from 15 June.
Skills England publishes Sector skills needs assessments
Priority areas relating to the built environment highlighted and described in brief.
BSRIA HVAC Market Watch - May 2025 Edition
Heat Pump Market Outlook: Policy, Performance & Refrigerant Trends for 2025–2028.
Committing to EDI in construction with CIOB
Built Environment professional bodies deepen commitment to EDI with two new signatories: CIAT and CICES.
Government Grenfell progress report at a glance
Line by line recomendation overview, with links to more details.
An engaging and lively review of his professional life.
Sustainable heating for listed buildings
A problem that needs to be approached intelligently.
50th Golden anniversary ECA Edmundson apprentice award
Deadline for entries has been extended to Friday 27 June, so don't miss out!
CIAT at the London Festival of Architecture
Designing for Everyone: Breaking Barriers in Inclusive Architecture.
Mixed reactions to apprenticeship and skills reform 2025
A 'welcome shift' for some and a 'backwards step' for others.
Licensing construction in the UK
As the latest report and proposal to licence builders reaches Parliament.
Building Safety Alliance golden thread guidance
Extensive excel checklist of information with guidance document freely accessible.
Fair Payment Code and other payment initiatives
For fair and late payments, need to work together to add value.
Pre-planning delivery programmes and delay penalties
Proposed for housebuilders in government reform: Speeding Up Build Out.
High street health: converting a building for healthcare uses
The benefits of health centres acting as new anchor sites in the high street.
Comments